Repository navigation
docs(work): add the cost and D1 overload follow-up brief - #310
Merged
Merged
Conversation
The 2026-09-29 fixes were measured one hour after deploy. The brief holds the baseline, targets and checklist for the week-later check, so it is picked up with the other open work.
Contributor
🤖 REVIEW SKIPPED
|
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
❓ Type of change
📚 Description
The 2026-09-29 cost and D1 overload fixes (#295 to #307, replication, two WAF rules) were measured one hour after deploy. A week of data is needed to confirm the savings and catch regressions. This adds an
EXECUTE-cost-followup.mdbrief with the baseline, targets and checklist, due 2026-10-06, so it is picked up with the other open work instead of living in a local note.